HomeWho we serveAbout usContact
EN NL
GPE – Global Potato Engineering Performance Scan →

Know within two weeks where your plant is losing.

An independent look at your line: where capacity, yield and utilities leak away, and what fixing it is worth.

Get in touch →
Duration1–2 weeks
ScopeFixed, agreed upfront
On site2–3 days in your plant
DeliverableBusiness case and 90-day plan
What we examine

Four places where a line loses

We measure and observe per process step, from intake to packing. So you see not only that there are losses, but where and why.

Capacity

Bottlenecks, downtime and micro-stops that keep the line below design capacity.

Yield

Product loss per step: peeling, cutting, sorting and rejects.

Utilities

Use of energy, water, steam and oil compared to benchmarks.

Quality

Variation in the end product and the process steps that drive it.

How it works

From intake to improvement plan in two weeks

Day 1

Intake

We discuss your goals and collect production data, drawings and reports.

Day 2–4

On site

Our team walks the line, measures and talks to operators and maintenance.

Week 2

Analysis

We quantify the losses and calculate improvement options.

Wrap-up

Presentation

You receive the business case and 90-day plan, explained to your team.

Deliverables

What you get

Loss analysis

Where capacity, product and energy are lost, per process step.

Business case

What each improvement costs and what it returns.

90-day improvement plan

Concrete steps to start with right away.

When a scan makes sense

For existing plants that want more from their line, without a long production stop.

Capacity falls short of expectations
Yield lower than planned
High costs for energy, water or oil
Modernisation without a long production stop
Arjan Brouwer
Your point of contact Arjan Brouwer Managing Partner

Frequently asked questions

Your project

What is your challenge?

Briefly describe what you are facing. One of our specialists will get in touch to think along with you.

No obligation. We respond within two working days.
Related services
Optimization ProgramMeasurable gains in yield, uptime, quality and utilities.
→
Feasibility studyCapacity, product mix, CAPEX, OPEX, location and risks.
→
Owner’s engineerVendor-independent
Active worldwidePotato processing specialists