Only accept what proves to perform.
We lead factory and site acceptance tests and guide commissioning and ramp-up, until the line delivers what was promised.
What we test before you sign off
Acceptance is your last moment of leverage. We make sure it counts.
Factory acceptance
Equipment tested at the supplier before it ships.
Site acceptance
Installation, safety and function checked on site.
Ramp-up
Step-by-step to stable production with your team.
Performance test
Capacity, yield and utilities measured against the contract.
From factory floor to stable production
Test plan
Criteria and procedures agreed with suppliers.
FAT
Tests at the supplier before shipment.
SAT
On-site tests and punch list.
Performance
Ramp-up and the final performance test.
What you get
Test protocols
Clear criteria per machine and per line.
Punch list
Open items tracked until they are closed.
Performance report
Proof that guarantees are met, or what is owed.
When to involve us
Well before delivery, so test criteria are part of the contract.
Frequently asked questions
Yes. We can do single tests or the full route to performance.
We document the gap and help you enforce the guarantees in the contract.
We support the ramp-up together with your team and the suppliers.