Only accept what proves to perform.

We lead factory and site acceptance tests and guide commissioning and ramp-up, until the line delivers what was promised.

Get in touch →
DurationDays to months
ScopePer test or full ramp-up
ForNew and rebuilt lines
DeliverableTest reports and proof of performance
What we examine

What we test before you sign off

Acceptance is your last moment of leverage. We make sure it counts.

Factory acceptance

Equipment tested at the supplier before it ships.

Site acceptance

Installation, safety and function checked on site.

Ramp-up

Step-by-step to stable production with your team.

Performance test

Capacity, yield and utilities measured against the contract.

How it works

From factory floor to stable production

Step 1

Test plan

Criteria and procedures agreed with suppliers.

Step 2

FAT

Tests at the supplier before shipment.

Step 3

SAT

On-site tests and punch list.

Step 4

Performance

Ramp-up and the final performance test.

Deliverables

What you get

Test protocols

Clear criteria per machine and per line.

Punch list

Open items tracked until they are closed.

Performance report

Proof that guarantees are met, or what is owed.

When to involve us

Well before delivery, so test criteria are part of the contract.

New line being delivered
Major rebuild completed
Disputes about performance
Slow or unstable ramp-up
Arjan Brouwer
Your point of contact Arjan Brouwer Managing Partner

Frequently asked questions

Your project

What is your challenge?

Briefly describe what you are facing. One of our specialists will get in touch to think along with you.

No obligation. We respond within two working days.
Related services
Owner’s EngineeringDesign review, interfaces, planning, budget and quality.
→
Optimization ProgramMeasurable gains in yield, uptime, quality and utilities.
→
Owner’s engineerVendor-independent
Active worldwidePotato processing specialists